Setting the Stage for Redevelopment in Fall River, MA
The United States Armory in Fall River, Massachusetts is a landmark with deep roots in the city’s military and industrial past. As this historic structure prepares for a new chapter, Banner Environmental Services was brought in to handle the critical first phase: removing hazardous materials and carefully dismantling interior elements to make way for future construction.
Our team performed a combination of asbestos abatement and selective demolition under strict compliance standards—safely and efficiently preparing the building for what comes next.
Asbestos Abatement in a Historic Federal Facility
Over decades of use, the Armory accumulated various asbestos-containing materials (ACM) commonly used in building construction prior to regulation. Banner’s licensed abatement team implemented a comprehensive removal plan, complete with:
- A ten-day asbestos notification submitted to the MA DEP
- Negative air containment zones and a three-stage decontamination unit
- Certified third-party clearance monitoring per 454 CMR 28.10(9)
We removed the following asbestos materials:
- 1,200+ SF of 9×9 asbestos-containing floor tile and mastic
- 2,200+ SF of asbestos transite panels on unit ventilators
- 300+ linear feet of pipe insulation (TSI), including elbows and joints
- Additional ACM caulking, sealants, and ductwork as identified
All hazardous waste was properly packaged, labeled, transported, and disposed of at licensed facilities per federal and state regulations.
Precision Selective Demolition Clears the Way for Progress
Once asbestos-containing materials were safely removed, Banner crews executed a targeted selective demolition plan. This included:
- Dismantling interior gypsum board and ceiling assemblies
- Removing mechanical units and non-load-bearing partitions
- Extracting obsolete MEP components and ventilation systems
- Clearing window systems and casings containing regulated materials
Selective demolition was staged and sequenced with the general contractor to maintain project momentum while protecting the structure’s historical integrity.
Balancing Preservation with Modernization
The Fall River Armory is more than a job site—it’s a piece of history. Banner Environmental approached the project with the care and respect it deserved, ensuring that every step we took brought the structure closer to safe reuse and revitalization.
Our work supports a growing movement across Massachusetts to preserve and repurpose historic buildings—safely transforming outdated facilities into modern community assets.
Why Banner Environmental for Asbestos Abatement and Demolition?
From federal courthouses to local libraries, Banner Environmental is trusted by municipalities, developers, and institutions for complex abatement and demolition jobs. We specialize in:
✔️ Historic and regulated environments
✔️ Multi-phase project coordination
✔️ Strict compliance with DEP and DLS standards
✔️ Communication with project stakeholders
When public safety and project timelines matter, Banner gets it done—right.
📞 Ready to talk? Contact us today or call 866-934-2374