Clean Slate at BSU: Banner Delivers Safe, Compliant Asbestos Abatement at Tillinghast Hall

Asbestos Abatement at Tillinghast Hall Bridgewater State University (BSU)

A Safer Start for Student Spaces in Bridgewater, MA

When the team at Bridgewater State University (BSU) prepared for upgrades inside Tillinghast Hall, they took no chances with student safety. Before any renovations could begin, they needed a professional environmental contractor to address one major issue: asbestos-containing floor tile hidden beneath old carpet and plywood.

Banner Environmental Services was selected to perform the full scope of asbestos abatement, ensuring the building was ready for transformation—safely, thoroughly, and in full compliance with environmental regulations.


Asbestos Tile Removal in an Educational Setting

Located in Bridgewater, Massachusetts, BSU’s Tillinghast Hall is a critical facility for the university. As with many older campus buildings, decades of use meant layers of flooring materials had been added over time—covering over potentially hazardous asbestos tiles.

Banner was tasked with:

  • Removing and disposing of approximately 8,061 square feet of asbestos-containing floor tile beneath carpet and plywood
  • Providing all necessary equipment, containment, and disposal containers on site
  • Ensuring full regulatory compliance with MassDEP, OSHA, and federal abatement protocols
  • Conducting the project on a tight, university-driven schedule with minimal disruption

Safety, Containment, and Compliance

Our licensed asbestos professionals began by setting up secure containment zones, placing warning signage, and utilizing HEPA-filtered negative air machines to protect indoor air quality. Banner’s team followed a strict workflow:

  • Carefully removed carpet and plywood to expose asbestos tile
  • Used industrial-grade techniques to lift, contain, and bag all ACM floor tile
  • Packaged, labeled, and manifested the waste per regulatory guidelines
  • Transported and disposed of the material at an approved hazardous waste facility

This project was conducted during normal working hours, Monday through Friday, under prevailing wage labor conditions and completed with zero safety incidents.


Minimizing Disruption in a High-Use Facility

Educational institutions like BSU face unique challenges when conducting environmental remediation. It’s not just about getting the job done—it’s about doing it without disrupting learning environments or day-to-day campus operations.

Banner coordinated closely with the university and general contractor to ensure:

  • Work areas were cleared and unoccupied during abatement
  • All Banner vehicles, dumpsters, and equipment remained accessible but out of high-traffic zones
  • All work was completed in a single mobilization, avoiding phased construction disruptions

The result? A cleared, hazard-free space ready for renovation.


Banner’s Commitment to Education and Environmental Safety

From public schools to major universities, Banner Environmental Services is a trusted partner in preparing facilities for safe, modern learning environments. Our team brings over 25 years of expertise in asbestos abatement, ensuring that every job is performed to the highest standards—on time and within scope.

With student and staff safety as our top priority, we bring precision, professionalism, and peace of mind to every educational project.


Ready to Start Your Remediation Project?

Whether you’re upgrading classrooms, repurposing dorms, or modernizing your campus, let Banner Environmental handle the hazards so you can focus on the future.

Contact us today to schedule a consultation or request a proposal.

24 HR Emergency Service866-934-2374


Bridgewater State University Project Images

Posted in ,