Renovation work becomes more complicated when asbestoscontaining materials may be present. A wall opening, flooring removal, ceiling replacement, pipe repair, or demolition phase can disturb materials
Renovation work becomes more complicated when asbestoscontaining materials may be present. A wall opening, flooring removal, ceiling replacement, pipe repair, or demolition phase can disturb materials
Finding asbestos in a ceiling tile, pipe wrap, floor tile, siding, or boiler room can stop a project instantly. The next decision matters: the right asbestos abatement contractor helps protect occupan
Strategic expansion enhances reconstruction capabilities while supporting clients, general contractors, and long-term project continuity Banner Environmental Services is proud to announce the launch of its new Carpentry Division, strengthening the company’s ability to support projects from environmental remediation through reconstruction across Massachusetts and greater New England. Known for its leadership in asbestos abatement, demolition, mold […]
Selective Demolition Project Overview • One Exchange Place, Worcester, MA We were contracted to perform full interior gut and selective demolition at One Exchange Place in Worcester, Massachusetts, a historically significant structure originally constructed in 1918. The building has served as a police station, courthouse, and first responder headquarters over its long history. Following a […]
Wastewater Treatment Facility Demolition Project Overview • Ipswich, MA We were contracted to perform structural demolition work at a wastewater treatment facility in Ipswich, Massachusetts, where an aging steel I-beam and hoist system needed to be removed as part of facility updates. The system had historically been used to lift and unload 2,000-pound pumps from […]
At the Newport Naval Base in Newport, Rhode Island, we completed a complex lead abatement and structural demolition project involving the removal of eighty-two (82) structural steel columns within an active military facility. The work required careful coordination, strict environmental controls, and full compliance with federal, state, and NAVFAC project requirements. The project focused on […]
Conference Center Demolition Project Overview • Pembroke, MA We completed a full building abatement and demolition project at the Arnold Hall Conference Center in Pembroke, Massachusetts, a property with a long history as part of a religious retreat and conference campus on the South Shore. The project required careful coordination due to the active campus […]
For Wayne Greene, every day at Banner Environmental is a new adventure. Now serving as Carpentry Division Manager, Wayne leads a division added in 2026 to expand Banner’s capabilities into full reconstruction. In this role, he seamlessly juggles a wide range of responsibilities—from overseeing field operations and supporting crews, to managing inventory, the warehouse, and […]